City Baths Restoration

May 2010 to June 2012, Value: $15 million.

This 100 year old heritage- listed building rebuild included the evaluation of existing plant and space planning around a restrictive city site and limited budget. The project includes lap pool, learner pool, spa/steam/sauna and a high specification gym.

 The pool hall ventilation system included heat reclaim and an efficient “displacement” air distribution system with air supplied at low level around the perimeter of the pool halls.

AQUATIC CENTRES