For this project we worked for the mechanical contractor as part of the design and build team.
The insulated pool building was constructed within a large warehouse in only 5 months.
The facility incorporates heat recovery and a cost efficient and remotely controlled building management system for the pool environment.
The SPLASH monitoring pool environment control is both in-house by management and dialled into by maintenance engineers.